COMMERCIAL AIR TEST CHECKLIST BEFORE SITE VISIT
- All Ventalation Outlets Above 2.5Mtrs High Must Be Sealed Before We Arrive On Site (Including Air Conditioning Vents)
- All External Doors Fitted And Closed
- All External Windows Fitted And Closed
- All Internal Doors Open
- Drainage Traps Filled With Water
- Loft Access Shut
- Fire Places Sealed/Fluu’S Blocked
- All Trickle Vents Closed Not Sealed (Including Velux Windows)
- All Builders Work Fully Completed
- All Sockets And Light Switches Fitted
- All Downlighters Fitted
- Any Cracks Or Holes Within The Fabric Of Walls, Floors Or Ceilings To Be Caulked Or Filled. Before The Engineer Arrives On Site.
- Mains 240 Volt Electricity On Site
Not To Seal
- Seals To External Doors
- Seals To Windows Or Sills
- Seals To Drains Or Sills
- Seals To Trickle Vents
- Seals To Loft Access
Note**
Engineer’S Site Visit Time Is Set For A Maximum Of 90Mins, If It Exceeds This Time A Surcharge Of £90Per Hour Will Be Charged.