COMMERCIAL AIR TEST CHECKLIST BEFORE SITE VISIT

  • All Ventalation Outlets Above 2.5Mtrs High Must Be Sealed Before We Arrive On Site (Including Air Conditioning Vents)
  • All External Doors Fitted And Closed
  • All External Windows Fitted And Closed
  • All Internal Doors Open
  • Drainage Traps Filled With Water
  • Loft Access Shut
  • Fire Places Sealed/Fluu’S Blocked
  • All Trickle Vents Closed Not Sealed (Including Velux Windows)
  • All Builders Work Fully Completed
  • All Sockets And Light Switches Fitted
  • All Downlighters Fitted
  • Any Cracks Or Holes Within The Fabric Of Walls, Floors Or Ceilings To Be Caulked Or Filled. Before The Engineer Arrives On Site.
  • Mains 240 Volt Electricity On Site

Not To Seal

  • Seals To External Doors
  • Seals To Windows Or Sills
  • Seals To Drains Or Sills
  • Seals To Trickle Vents
  • Seals To Loft Access

Note** Engineer’S Site Visit Time Is Set For A Maximum Of 90Mins, If It Exceeds This Time A Surcharge Of £90Per Hour Will Be Charged.